Sign In | Join Free | My insurersguide.com
China Daoyunai Energy Saving Technology Limited logo
Daoyunai Energy Saving Technology Limited
Committed to underground pipeline CIPP and CCTV
Verified Supplier

4 Years

Home > UV Cured CIPP >

Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation

Daoyunai Energy Saving Technology Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation

Brand Name : DAO

Place of Origin : Jiangsu, China

MOQ : 57 m

Price : Variable

Payment Terms : T/T

Supply Ability : 330 km per year

Delivery Time : 15 working days

Packaging Details : Normal

Material : Fiberglass saturated resin

Diameter : DN1000

Thickness : 10mm

Length : 115m

Weight : Variable

Life : 50 years

Contact Now

Fiberglass saturated resin installation for underground pipelines by no excavation

UV CIPP trenchless construction for sewer repair

At the same time as pulling the liner, the operator at the bottom of the inspection well shall be in place to assist the hose at all times to ensure that it is always at the bottom of the pipe without touching the top of the pipe.

If the material diameter is greater than or equal to DN600, it is recommended to apply grease or detergent water at the bottom of the material or above the bottom film to reduce friction.

At the same time, pay attention to the flatness of the material at all times to ensure that it is not knotted or bent. Otherwise, once the material enters the pipeline, it will be difficult to fully expand in case of winding, resulting in waste and economic losses.

At the end of the manhole section, the person responsible for dragging the bottom film and hose should use a hoist, which requires 3-5 tons.

Always pay attention to the safety of operators at the bottom of the manhole.

For the pipes below DN600, the lamp chain shall be used for curing, and the installation of the stainless steel tie at one end and the assembly of the lamp chain shall be completed on the ground.

For pipelines above DN600, the lamp holder shall be used for curing. If the manhole or wellhead is too small, the installation of stainless steel binding head and the assembly of the lamp holder shall be completed inside the pipeline.

When the hose is still 5 meters long, stop dragging and start to install stainless steel ties.

Function Trenchless repair
Application Cured-in-place-pipe
Length Any length is possible

Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation


Product Tags:

UV-Cured CIPP Lining DAO

      

uv cipp equipment Cured DAO

      

uv cipp equipment Lining DAO

      
Cheap Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation for sale

Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Daoyunai Energy Saving Technology Limited
*Subject:
*Message:
Characters Remaining: (0/3000)